Draft for expert review, not for publication. The evidence behind this page is loaded in the knowledge graph; the workflow itself (Steps and flows) is as in the 10 October graph.
Worked workflow, draft
International Terrestrial Reference Frame (ITRF)
The ITRF is the realisation of the International Terrestrial Reference System. The IERS ITRS Centre, hosted by IGN in France, maintains it. Three IERS ITRS Combination Centres (IGN, DGFI-TUM in Germany, JPL in the USA) each compute a realisation from the series that four IAG technique services (IVS, ILRS, IGS, IDS) send in, together with local ties at co-location sites. One realisation is chosen as the official ITRF after a validation procedure; for ITRF2008, ITRF2014 and ITRF2020 it was IGN's. This page sets out the chain as the sources support it, where the earlier workflow (DataBook v0.4.1) differs, and what is still unknown.
Evidence as of the ggsc dump of 10 Oct 2026 (topology and source records) and pages and papers fetched on 12 Oct 2026.
Where this page's data comes from. This page is built from a data file generated on 12 October 2026 from the 10 October copy of the graph and the pages and papers read on 12 October. The evidence behind it (graph https://w3id.org/ggsc/graph/itrf-evidence) and its new source records are now loaded in the knowledge graph. The page does not query the graph when it is opened, so changes made in the graph after 12 October show here only when the page is regenerated.
The workflow: Steps and how they connect
Each row is a Function, in production order; each card is a Step in the knowledge graph and each arrow a flow from one Step to the next. Select a card to read its flows. What the sources say about each Step follows further down.
F1 · Multi-Technique Ground Tracking
Data level: Basis
Feeds: F2, F3
F1-colocCo-located sites1 flow out · select to read
2+ techniques at one monument
Flows to: Local tie surveys
F1-gnssGNSS1 flow out · select to read
500+ continuous stations (IGSNetwork.json, 8 Oct 2026: 535 current stations)
Flows to: Near-real-time push
F1-slrdSLR · DORIS1 flow out · select to read
ILRS station list: 57 site entries (ilrs.gsfc.nasa.gov station page, 8 Oct 2026; active count not stated) · ~60 IDS beacons
Flows to: Scheduled uploads
F1-vlbiVLBI1 flow out · select to read
~40 radio telescopes
Flows to: e-VLBI transfer
F2 · Co-Location Local Tie Surveys
Data level: Basis → Level 1
Feeds: F7
F2-locLocal tie surveys1 flow out · select to read
terrestrial links between technique reference points
Flows to: ITRS Product Center (IGN) — CATREF stacking
F3 · First-Mile Telemetry & Data Transport
Data level: Basis → Level 1
Feeds: F4
F3-evlbie-VLBI transfer1 flow out · select to read
time-critical VLBI sessions
Flows to: Global Data Centres ×3 — CDDIS (NASA GSFC) · IGN · SIO
F3-pushNear-real-time push1 flow out · select to read
GNSS
Flows to: Global Data Centres ×3 — CDDIS (NASA GSFC) · IGN · SIO
F3-schedScheduled uploads1 flow out · select to read
SLR · DORIS
Flows to: Global Data Centres ×3 — CDDIS (NASA GSFC) · IGN · SIO
F4 · Global Archiving & Synchronization
Data level: Level 1
Feeds: F5, F6
F4-gdcGlobal Data Centres ×3 — CDDIS (NASA GSFC) · IGN · SIO4 flows out · select to read
ingest and standardise (RINEX, SINEX) · mirrored by equalization protocol
Flows to: VLBI correlators; IDS (DORIS); IGS (GNSS); ILRS (SLR)
F5 · VLBI Correlation & Delay Extraction
Data level: Level 1 (intermediate)
Feeds: F6
F5-corrVLBI correlators1 flow out · select to read
Washington · Bonn · group delays
Flows to: IVS (VLBI)
F6 · Intra-Technique Analysis
Data level: Level 1 → 2 (intermediate)
Feeds: F7
F6-idsIDS (DORIS)1 flow out · select to read
combined SINEX
Flows to: ITRS Product Center (IGN) — CATREF stacking
F6-igsIGS (GNSS)1 flow out · select to read
SINEX via ACC (GA + NASA GSFC)
Flows to: ITRS Product Center (IGN) — CATREF stacking
F6-ilrsILRS (SLR)1 flow out · select to read
combined SINEX
Flows to: ITRS Product Center (IGN) — CATREF stacking
F6-ivsIVS (VLBI)1 flow out · select to read
combined SINEX
Flows to: ITRS Product Center (IGN) — CATREF stacking
F7 · ITRS Combination & Stacking (IGN / CATREF)
Data level: Level 3 (Global Reference Frames — ITRF)
Feeds: F8
F7-itrsITRS Product Center (IGN) — CATREF stacking1 flow out · select to read
technique SINEX + local ties + Earth orientation series → unified ITRF
Flows to: IGN candidate ITRF
F7-candIGN candidate ITRF1 flow out · select to read
proprietary in-house software
Flows to: Comparison with IGN candidate
F8 · Independent Cross-Validation
Data level: Level 3 (pre-designation)
Feeds: F9
F8-dtrfDGFI-TUM · DTRF1 flow out · select to read
DOGS-CS software
Flows to: Comparison with IGN candidate
F8-jtrfNASA JPL · JTRF1 flow out · select to read
SREF square-root information filter and smoother
Flows to: Comparison with IGN candidate
F8-cmpComparison with IGN candidate1 flow out · select to read
origin · scale · station positions · EOP
Flows to: Discrepancy review & formal designation
F9 · Formal Designation & Dissemination
Data level: Level 3 (validated Global Reference Frame)
Last Function in the chain.
F9-desDiscrepancy review & formal designation1 flow out · select to read
IERS Directing Board · official ITRF realisation
Flows to: Dissemination
F9-disDisseminationend of chain · select to read
authoritative reference for Member State geodetic activities
Flows to: nothing: the chain ends here in the graph
How to read the statuses
Our check of the source: Confirmed Our check of the source: Considered Our check of the source: Unverified
Our check of the source. Confirmed: we fetched the source and the specific claim matched. Considered: the source was reachable and relevant but the claim was not fully matched. Unverified: not fetched, not reachable, or no source. Each statement shows the lowest status among the records it cites. There are no tags from Nick Brown on this page: the ITRF has no artifact of his.
Against the earlier workflow, v0.4.1: KeptAgainst the earlier workflow, v0.4.1: ChangedAgainst the earlier workflow, v0.4.1: NewAgainst the earlier workflow, v0.4.1: Unknown
Against the earlier workflow (v0.4.1). Kept: the sources support what it said. Changed: the wording is corrected. New: detail it did not have. Unknown: the sources reviewed do not answer. A source marked proposed in the list at the foot of the page has been fetched and read but is not yet a record in the provenance graph.
The chain, from the stations to the published frame
Nine Functions, as in the knowledge graph (topology of the 10 Oct 2026 dump). Each shows its graph Steps and where they flow, then what the sources say. Select a Function to open it.
F1 · Multi-Technique Ground TrackingCounts corrected; six sites carry all four techniques . 3 open questions
- Graph step ITRF-F1-coloc: Co-located sites . 2+ techniques at one monument . flows to: F2-loc
- Graph step ITRF-F1-gnss: GNSS . 500+ continuous stations (IGSNetwork.json, 8 Oct 2026: 535 current stations) . flows to: F3-push
- Graph step ITRF-F1-slrd: SLR · DORIS . ILRS station list: 57 site entries (ilrs.gsfc.nasa.gov station page, 8 Oct 2026; active count not stated) · ~60 IDS beacons . flows to: F3-sched
- Graph step ITRF-F1-vlbi: VLBI . ~40 radio telescopes . flows to: F3-evlbi
GNSS: the IGS network file lists 535 entries (counted 12 Oct 2026; the file does not say whether every entry is a current station). The ITRF2020 GNSS input retained 1,344 stations at 1,159 sites out of 1,905 submitted.[1],[2]
Against the earlier workflow, v0.4.1: ChangedOur check of the source: Confirmed
VLBI: the IVS list of network stations has 38 entries. The ITRF2020 VLBI input covers 154 stations at 117 sites over the whole observation history, and only 14 of those sites are in the southern hemisphere.[3],[2]
Against the earlier workflow, v0.4.1: ChangedOur check of the source: Confirmed
SLR: no ILRS page fetched states a count of active stations, and the ITRF2020 SLR station and site counts were not found in the sections read.
Against the earlier workflow, v0.4.1: Unknownno source check
DORIS: the IDS 16 input has 201 stations at 87 sites. The earlier workflow's 'about 60 beacons' is not on any IDS page fetched.[4],[2]
Against the earlier workflow, v0.4.1: ChangedOur check of the source: Confirmed
Co-location: the ITRF2020 network has 1,835 stations at 1,243 sites, about a tenth of them co-located with two, three or four instruments. Local ties exist for 101 sites. Six sites carry all four techniques: Metsahovi, Wettzell, Badary, Hartebeesthoek, Greenbelt and Yarragadee. The stations graph records 12 four-technique sites by a looser rule.[2]
Against the earlier workflow, v0.4.1: ChangedOur check of the source: Confirmed
F2 · Co-Location Local Tie SurveysWho surveys the ties is now sourced
- Graph step ITRF-F2-loc: Local tie surveys . terrestrial links between technique reference points . flows to: F7-itrs
Least-squares adjustments of local surveys are performed by national agencies that operate the co-location sites, giving differential coordinates between instrument reference points. The DORIS survey data were re-adjusted by the IGN survey department. ITRF2020 used 253 tie vectors between GNSS and the other techniques (77 VLBI, 53 SLR, 123 DORIS) and 66 more between old and current DORIS beacon points.[2],[5]
Against the earlier workflow, v0.4.1: NewOur check of the source: Considered
F3 · First-Mile Telemetry & Data TransportNo ITRF-specific source . 1 open question
- Graph step ITRF-F3-evlbi: e-VLBI transfer . time-critical VLBI sessions . flows to: F4-gdc
- Graph step ITRF-F3-push: Near-real-time push . GNSS . flows to: F4-gdc
- Graph step ITRF-F3-sched: Scheduled uploads . SLR · DORIS . flows to: F4-gdc
No source fetched describes how observations reach the data centres for the ITRF chain. The graph's three Steps (near-real-time push, scheduled uploads, e-VLBI transfer) are generic mechanisms without a source for this product.
Against the earlier workflow, v0.4.1: Unknownno source check
F4 · Global Archiving & SynchronizationEach technique has its own data centres . 2 open questions
- Graph step ITRF-F4-gdc: Global Data Centres ×3 — CDDIS (NASA GSFC) · IGN · SIO . ingest and standardise (RINEX, SINEX) · mirrored by equalization protocol . flows to: F5-corr, F6-ids, F6-igs, F6-ilrs
The earlier workflow lists three global data centres (CDDIS, IGN, SIO) for every technique. Those are IGS data centres. Each service names its own.[6]
Against the earlier workflow, v0.4.1: ChangedOur check of the source: Considered
IVS: three primary data centres, CDDIS, BKG and Paris Observatory. Whether BKG's archive is operating in 2026 is open.[7]
Against the earlier workflow, v0.4.1: ChangedOur check of the source: Confirmed
IDS: two data centres, CDDIS and IGN.[8]
Against the earlier workflow, v0.4.1: ChangedOur check of the source: Confirmed
ILRS: operations centres NASA and EDC; the ITRF2020 SLR observations were retrieved from the CDDIS and EDC archives.[9],[2]
Against the earlier workflow, v0.4.1: ChangedOur check of the source: Confirmed
IGS: six global data centres appear as logos on the IGS data access page; they are not listed in text, so the list is not treated as confirmed.[6]
Against the earlier workflow, v0.4.1: UnknownOur check of the source: Considered
The ITRF2020 input data are held at CDDIS (NASA GSFC, USA).[2]
Against the earlier workflow, v0.4.1: NewOur check of the source: Confirmed
F5 · VLBI Correlation & Delay ExtractionUnchanged
- Graph step ITRF-F5-corr: VLBI correlators . Washington · Bonn · group delays . flows to: F6-ivs
VLBI correlation is done at the IVS correlators, among them the Washington Correlator (sponsor NEOS) and the Astro/Geo Correlator at MPIfR.[10]
Against the earlier workflow, v0.4.1: KeptOur check of the source: Confirmed
F6 · Intra-Technique AnalysisFour technique pipelines; the GNSS route corrected
- Graph step ITRF-F6-ids: IDS (DORIS) . combined SINEX . flows to: F7-itrs
- Graph step ITRF-F6-igs: IGS (GNSS) . SINEX via ACC (GA + NASA GSFC) . flows to: F7-itrs
- Graph step ITRF-F6-ilrs: ILRS (SLR) . combined SINEX . flows to: F7-itrs
- Graph step ITRF-F6-ivs: IVS (VLBI) . combined SINEX . flows to: F7-itrs
IVS: the IVS Combination Centre (BKG and DGFI-TUM, Germany) combines the solutions of 11 analysis centres into datum-free normal equations; 6,178 session solutions entered ITRF2020.[2],[11]
Against the earlier workflow, v0.4.1: KeptOur check of the source: Confirmed
ILRS: the primary combination centre is ASI/CGS (Italy) and the backup JCET/UMBC (USA). The submission is 244 fortnightly and 1,459 weekly loosely constrained solutions.[2]
Against the earlier workflow, v0.4.1: NewOur check of the source: Confirmed
IDS: the combination centre is at CLS under contract with CNES, with software and strategy support from LAREG/IGN. IDS 16 combines four analysis centres (ESA, GOP, GRG, GSC) in 1,456 weekly solutions, and the combination used IGN's CATREF package.[12],[4],[2]
Against the earlier workflow, v0.4.1: NewOur check of the source: Confirmed
IGS: the IGS Reference Frame Coordinator combines the analysis centres' SINEX solutions (ten analysis centres, 9,861 daily solutions from the third reprocessing campaign). The working group includes the IGS RF team at IGN, France.[13],[2]
Against the earlier workflow, v0.4.1: ChangedOur check of the source: Confirmed
The earlier workflow sends GNSS SINEX 'via the Analysis Centre Coordinator (Geoscience Australia and NASA GSFC)'. The Coordinator leads the operational IGS products; the route into the ITRF is the Reference Frame Coordinator.[14],[13]
Against the earlier workflow, v0.4.1: ChangedOur check of the source: Confirmed
F7 · ITRS Combination & Stacking (IGN / CATREF)Hosting, software and funding stated; 'proprietary' withdrawn . 2 open questions
- Graph step ITRF-F7-cand: IGN candidate ITRF . proprietary in-house software . flows to: F8-cmp
- Graph step ITRF-F7-itrs: ITRS Product Center (IGN) — CATREF stacking . technique SINEX + local ties + Earth orientation series → unified ITRF . flows to: F7-cand
The ITRS Centre of the IERS, hosted by IGN (France), is responsible for maintaining the ITRS and ITRF and for the official ITRF solutions. The ITRF2020 data-set citation reads 'hosted by IGN and IPGP'; no page fetched states IPGP's role.[15],[2]
Against the earlier workflow, v0.4.1: KeptOur check of the source: Confirmed
IGN stacks the time series of all four techniques with local ties and co-motion constraints in a single step, for the first time in the history of the ITRF, using CATREF. Post-seismic deformation models cover 118 sites.[2],[16]
Against the earlier workflow, v0.4.1: KeptOur check of the source: Confirmed
CATREF is licensed and restricted: the ITRF2020 paper says it is available free of charge to research groups within institutions that sign an agreement with IGN for non-commercial research. "IGN's CATREF" is the wording the source supports.[2]
Against the earlier workflow, v0.4.1: ChangedOur check of the source: Confirmed
The ITRF activities are funded by IGN and partly by CNES (TOSCA grant).[2]
Against the earlier workflow, v0.4.1: NewOur check of the source: Confirmed
F8 · Independent Cross-ValidationParallel realisations, but they share the inputs . 5 open questions
- Graph step ITRF-F8-cmp: Comparison with IGN candidate . origin · scale · station positions · EOP . flows to: F9-des
- Graph step ITRF-F8-dtrf: DGFI-TUM · DTRF . DOGS-CS software . flows to: F8-cmp
- Graph step ITRF-F8-jtrf: NASA JPL · JTRF . SREF square-root information filter and smoother . flows to: F8-cmp
DGFI-TUM (Germany) and JPL (USA) are the other two IERS ITRS Combination Centres. DTRF2020 uses a two-step combination on normal-equation level; JTRF2020 uses SREF, a square-root information filter and smoother (replacing the Kalman filter and GipsyX named in the earlier workflow).[17],[18],[19],[20]
Against the earlier workflow, v0.4.1: ChangedOur check of the source: Confirmed
Both realisations are computed from the technique inputs submitted for ITRF2020. Their independence from the IGN solution is one of method, because the input data are shared. The workflow topology draws no flow from the technique analysis Steps into the DTRF and JTRF Steps.[2],[18],[21]
Against the earlier workflow, v0.4.1: ChangedOur check of the source: Considered
DOGS-CS is not named on the DGFI-TUM pages that describe the DTRF2020 combination (they name APROPOS for post-seismic deformation). The claim is Unverified.[17]
Against the earlier workflow, v0.4.1: ChangedOur check of the source: Confirmed
The IERS states that a validation procedure precedes the choice of the official solution. No page fetched says who performs it or what is compared; the criteria in the earlier workflow (origin, scale, station positions, Earth orientation parameters) are not sourced.[22]
Against the earlier workflow, v0.4.1: UnknownOur check of the source: Confirmed
F9 · Formal Designation & DisseminationDesignation by the Directing Board not shown . 2 open questions
- Graph step ITRF-F9-des: Discrepancy review & formal designation . IERS Directing Board · official ITRF realisation . flows to: F9-dis
- Graph step ITRF-F9-dis: Dissemination . authoritative reference for Member State geodetic activities . flows to: nothing in the graph
The ITRS Centre publishes the ITRF at itrf.ign.fr. New versions come 'from one to several years' apart.[15],[23]
Against the earlier workflow, v0.4.1: KeptOur check of the source: Confirmed
The IERS Directing Board exercises general control over the activities of the service. No page fetched shows the Board designating a realisation, so 'Directing Board designates the ITRF' is not supported as a step in this product.[24]
Against the earlier workflow, v0.4.1: ChangedOur check of the source: Confirmed
Updates since ITRF2020: ITRF2020-u2023 and ITRF2020-u2024 (IGN), DTRF2020-u2023 (DGFI-TUM), JTRF2020-u2022 (JPL).[22]
Against the earlier workflow, v0.4.1: NewOur check of the source: Confirmed
The ITRF2020 UT1 and LOD values first published were wrong because of a sign error in tidal corrections applied by the IVS combination centre; they were corrected on 9 Aug 2023. Other parameters were not affected. A fault in one service's combination reached the published product.[16]
Against the earlier workflow, v0.4.1: NewOur check of the source: Confirmed
Gap in the topology, reported as found. The sources show F8-dtrf and F8-jtrf built from the same service inputs as the IGN solution, but the topology has no flow into those Steps . The F7 Step also names Earth orientation series as an input without a flow for them; the sources say the parameters arrive inside each technique's series.
Four technique services send one series each to the ITRS Centre
Each service combines its analysis centres' solutions before the ITRS Centre sees them. Counts are for the series submitted to ITRF2020 unless marked as a current list. The columns of the series (span, sampling, constraints, parameters) are Table 1 of IERS Technical Note 41.
IVS . VLBI
- In the ITRF2020 input:
- 154 stations; 117 sites; 14 southern hemisphere sites; 6,178 session-wise solutions; 11 analysis centres
- Current list:
- 38 entries on 2026-10-12 (IVS Network Stations list)
- Series:
- 1980.0 - 2021.0; daily; Normal Eq.; constraints none; parameters PM, PMr, LOD, UT1-UTC
- Combined by:
- BKG/DGFI Combination Center (combination centre (BKG and DGFI-TUM, Germany))
- Data centres:
- Crustal Dynamics Data Information System (CDDIS) (primary data centre); BKG (primary data centre); Paris Observatory (primary data centre)
ILRS . SLR
- In the ITRF2020 input:
- 244 fortnightly solutions; 1,459 weekly solutions
- Current list:
- no stated count
- Series:
- 1983.0 - 1993.0 (fortnightly), 1993.0 - 2021.0 (weekly); fortnightly, then weekly; Var-Cov; constraints loose; parameters PM, LOD
- Combined by:
- Centro di Geodesia Spaziale Matera (primary combination centre (ASI/CGS))
- Data centres:
- NASA (operations centre); EDC (operations centre)
IGS . GNSS
- In the ITRF2020 input:
- 1,905 submitted stations; 1,344 retained stations; 1,159 retained sites; 9,861 daily solutions; 10 analysis centres
- Current list:
- 535 entries on 2026-10-12 (IGSNetwork.json)
- Series:
- 1994.0 - 2021.0; daily; Var-Cov; constraints minimum; parameters PM, PMr, LOD
- Combined by:
- IGN France (Reference Frame Coordinator and RF team)
- Data centres:
- not recorded
IDS . DORIS
- In the ITRF2020 input:
- 201 stations; 87 sites; 1,456 weekly solutions; 4 analysis centres
- Current list:
- no stated count
- Series:
- 1993.0 - 2021.0; weekly; Var-Cov; constraints minimum; parameters PM
- Combined by:
- CLS (under contract with CNES) (combination centre)
- Data centres:
- Crustal Dynamics Data Information System (CDDIS) (data centre); IGN France (data centre)
Only the IVS series carries UT1-UTC. The ITRF2020 UT1 and LOD values were the ones affected by the 2023 erratum, which came from the IVS combination (Function F9).
Three combination centres, one official ITRF
Each ITRS Combination Centre computes a realisation. After a validation procedure whose actor and criteria the sources do not state, one is defined to be the official ITRF. For 2008, 2014 and 2020 that was IGN's.
ITRF2020official
- Computed by:
- IGN France (F7-itrs)
- Software:
- CATREF
- Method:
- One-step combination: the time series of the four techniques are accumulated together with the local ties and co-motion constraints at co-location sites in a single process.
- Inputs:
- IVS, ILRS, IGS, IDS
DTRF2020parallel
- Computed by:
- DGFI-TUM — Deutsches Geodätisches Forschungsinstitut, Technische Universität München (F8-dtrf)
- Software:
- not stated in the pages fetched
- Method:
- Two-step combination on normal-equation level: technique-specific multi-year solutions first, then their combination into DTRF2020; post-seismic deformation approximated with APROPOS. The software that performs the combination is not named on the pages fetched (open gap G03).
- Inputs:
- IVS, ILRS, IGS, IDS
JTRF2020parallel
- Computed by:
- NASA Jet Propulsion Laboratory (F8-jtrf)
- Software:
- SREF
- Method:
- Sequential estimation with a square-root information filter and a Dyer-McReynolds covariance smoother, assimilating the inputs submitted for ITRF2020.
- Inputs:
- IVS, ILRS, IGS, IDS
| Service input | ITRF2020 | DTRF2020 | JTRF2020 |
|---|---|---|---|
| IVS | uses | uses | uses |
| ILRS | uses | uses | uses |
| IGS | uses | uses | uses |
| IDS | uses | uses | uses |
Derived from the evidence data. All three use all four. Their independence is one of method, because the input data are shared. Whether DGFI-TUM and JPL used exactly the same submissions (same files, same weights) is an open question.
Earlier editions and updates
ITRF2008 (IGN France, official); ITRF2014 (IGN France, official); DTRF2008 (DGFI-TUM — Deutsches Geodätisches Forschungsinstitut, Technische Universität München, parallel); DTRF2014 (DGFI-TUM — Deutsches Geodätisches Forschungsinstitut, Technische Universität München, parallel); JTRF2014 (NASA Jet Propulsion Laboratory, parallel). Updates: ITRF2020-u2023 (IGN France); ITRF2020-u2024 (IGN France); DTRF2020-u2023 (DGFI-TUM — Deutsches Geodätisches Forschungsinstitut, Technische Universität München); JTRF2020-u2022 (NASA Jet Propulsion Laboratory); the sources do not say whether an update is official.[22]
Co-location, local ties and shares
Counts from IERS Technical Note 41 and the technique services. A share is the part divided by the whole, computed when the page is built and never stored in the graph.
| Count | Technique | Number | Share of its whole | Scope | Status and sources |
|---|---|---|---|---|---|
| stations | all | 1,835 | ITRF2020 network | Our check of the source: Confirmed[2] | |
| sites | all | 1,243 | ITRF2020 network | Our check of the source: Confirmed[2] | |
| sites, post-seismic deformation models | all | 118 | ITRF2020 network | Our check of the source: Confirmed[2] | |
| sites, sites with two or more technique instruments | all | 101 | Local ties | Our check of the source: Confirmed[2] | |
| sites, Metsahovi, Wettzell, Badary, Hartebeesthoek, Greenbelt, Yarragadee | all | 6 | Co-location | Our check of the source: Confirmed[2] | |
| sites | DORIS+SLR | 12 | Co-location | Our check of the source: Confirmed[2] | |
| sites | DORIS+VLBI | 10 | Co-location | Our check of the source: Confirmed[2] | |
| sites | SLR+VLBI | 8 | Co-location | Our check of the source: Confirmed[2] | |
| tie vectors | all | 253 | Local ties | Our check of the source: Confirmed[2] | |
| tie vectors | VLBI | 77 | 30.4% of 253 tie vectors | Local ties | Our check of the source: Confirmed[2] |
| tie vectors | SLR | 53 | 20.9% of 253 tie vectors | Local ties | Our check of the source: Confirmed[2] |
| tie vectors | DORIS | 123 | 48.6% of 253 tie vectors | Local ties | Our check of the source: Confirmed[2] |
| tie vectors, old to current DORIS beacon, DORIS-only sites | DORIS | 66 | Local ties | Our check of the source: Confirmed[2] | |
| stations, submitted | GNSS | 1,905 | ITRF2020 input | Our check of the source: Confirmed[2] | |
| stations, retained | GNSS | 1,344 | 70.6% of 1,905 stations | ITRF2020 input | Our check of the source: Confirmed[2] |
| sites, retained | GNSS | 1,159 | ITRF2020 input | Our check of the source: Confirmed[2] | |
| solutions, daily | GNSS | 9,861 | ITRF2020 input | Our check of the source: Confirmed[2] | |
| analysis centres | GNSS | 10 | ITRF2020 input | Our check of the source: Confirmed[2] | |
| list entries, IGSNetwork.json | GNSS | 535 | Current list, 2026-10-12 | Our check of the source: Confirmed[1] | |
| stations | VLBI | 154 | ITRF2020 input | Our check of the source: Confirmed[2] | |
| sites | VLBI | 117 | ITRF2020 input | Our check of the source: Confirmed[2] | |
| sites, southern hemisphere | VLBI | 14 | 12.0% of 117 sites | ITRF2020 input | Our check of the source: Confirmed[2] |
| solutions, session-wise | VLBI | 6,178 | ITRF2020 input | Our check of the source: Confirmed[2] | |
| analysis centres | VLBI | 11 | ITRF2020 input | Our check of the source: Confirmed[2] | |
| list entries, IVS Network Stations list | VLBI | 38 | Current list, 2026-10-12 | Our check of the source: Confirmed[3] | |
| solutions, fortnightly | SLR | 244 | ITRF2020 input | Our check of the source: Confirmed[2] | |
| solutions, weekly | SLR | 1,459 | ITRF2020 input | Our check of the source: Confirmed[2] | |
| stations | DORIS | 201 | ITRF2020 input | Our check of the source: Confirmed[4],[2] | |
| sites | DORIS | 87 | ITRF2020 input | Our check of the source: Confirmed[4],[2] | |
| solutions, weekly | DORIS | 1,456 | ITRF2020 input | Our check of the source: Confirmed[4],[2] | |
| analysis centres | DORIS | 4 | ITRF2020 input | Our check of the source: Confirmed[4],[2] |
Who holds which role
Role assertions from the evidence graph, grouped by organisation. The graph held no record of the ITRS Centre or of IGN as a combination centre before; these are proposed. Organisations without a node in the graph are named by label.
IGN France6 roles
- ITRS Centre: hosts the IERS ITRS Centre. F7-itrs[2],[15]The ITRF2020 data-set citation reads 'IERS ITRS Center Hosted by IGN and IPGP'. No page fetched states IPGP's role (open gap G10).Our check of the source: Confirmed
- Funder: funds the ITRF activities. F7-itrs[2]Our check of the source: Confirmed
- ITRS Combination Centre: realisation selected as the official ITRF2008, ITRF2014 and ITRF2020. F7-itrs[20],[22]Our check of the source: Confirmed
- Technique combination centre, IDS: software and strategy support (LAREG/IGN). F6-ids[12],[2]The IDS appendix of the ITRF2020 paper says the software used for the IDS combination was the IGN/LAREG CATREF package.Our check of the source: Confirmed
- Technique combination centre, IGS: Reference Frame Coordinator and RF team. F6-igs[13],[2]The IGS page lists 'members of the IGS RF team at IGN, France'; the coordinator's affiliation in the ITRF2020 paper includes IGN. The IGS Analysis Centre Coordinator (NASA GSFC and Geoscience Australia, record igsmail-8493) does not appear on this route.Our check of the source: Confirmed
- Technique data centre, IDS: data centre. F4-gdc[8]Our check of the source: Confirmed
Crustal Dynamics Data Information System (CDDIS)3 roles
BKG1 role
- Technique data centre, IVS: primary data centre. F4-gdc[7]Operating status in 2026 is open (gap G06); the EOP evidence work found an IVS Board statement of an outage from April 2023.Our check of the source: Confirmed
BKG/DGFI Combination Center1 role
Centre National d'Etudes Spatiales (CNES)1 role
- Funder: partly funds the ITRF activities (TOSCA grant). F7-itrs[2]Our check of the source: Confirmed
Centro di Geodesia Spaziale Matera1 role
- Technique combination centre, ILRS: primary combination centre (ASI/CGS). F6-ilrs[2]The graph node is the Centro di Geodesia Spaziale, Matera, matched to 'ASI/CGS' by name.Our check of the source: Confirmed
CLS (under contract with CNES)1 role
DGFI-TUM — Deutsches Geodätisches Forschungsinstitut, Technische Universität München1 role
EDC (ILRS operations centre)1 role
- Technique data centre, ILRS: operations centre. F4-gdc[9]Our check of the source: Confirmedno node in the graph
Joint Center for Earth System Technology/Goddard Space Flight Center Greenbelt, Maryland1 role
- Technique combination centre, ILRS: backup combination centre (JCET/UMBC). F6-ilrs[2]Our check of the source: Confirmed
NASA (ILRS operations centre)1 role
- Technique data centre, ILRS: operations centre. F4-gdc[9]Our check of the source: Confirmedno node in the graph
NASA Jet Propulsion Laboratory1 role
Paris Observatory1 role
- Technique data centre, IVS: primary data centre. F4-gdc[7]Our check of the source: Confirmed
Where the chain concentrates
Facts drawn from the evidence above. No performance ratings are applied.
The official product sits in one institution and one jurisdiction
IGN (France) hosts the ITRS Centre, is one of the three combination centres, produced the official ITRF2008, ITRF2014 and ITRF2020, supports the IDS combination, is home to the IGS reference-frame team and is a second IDS data centre. Funding is stated as IGN and partly CNES. The evidence data record six distinct roles for IGN.[22],[2],[12],[13],[8]
Our check of the source: Confirmed
The alternatives share the input data
DTRF2020 and JTRF2020 use the same four service submissions as ITRF2020, so they check the combination method; an error in an input series reaches all three. DGFI-TUM also runs, with BKG, the IVS combination centre whose series is the VLBI input to ITRF2020, the input the other two realisations are also built from. The authority that selects the official solution is not shown.[2],[18],[11],[22]
Our check of the source: Confirmed
One archive appears across techniques
CDDIS (NASA GSFC, USA) is a primary IVS data centre, an IDS data centre, an ILRS archive and holds the ITRF2020 input data. Each technique has a second centre (BKG and Paris Observatory for IVS, IGN for IDS, EDC for ILRS).[7],[8],[9],[2]
Our check of the source: Confirmed
Each technique is combined in a different jurisdiction
Germany for VLBI (BKG and DGFI-TUM), Italy for SLR (ASI/CGS, with a US backup), France for DORIS (CLS under CNES contract, with IGN support) and an IGN-linked team for GNSS. CATREF, IGN's package, is used both in the IDS combination and in the ITRF combination.[2],[12],[13]
Our check of the source: Confirmed
Few sites tie the techniques together
Only six sites carry all four techniques, and only 14 of 117 VLBI sites in the ITRF2020 input (12.0 per cent) are in the southern hemisphere. The pairs DORIS-SLR, DORIS-VLBI and SLR-VLBI have 12, 10 and 8 co-location sites; the paper says that is too few to combine those three techniques without GNSS.[2]
Our check of the source: Confirmed
Where the earlier workflow (v0.4.1) differed, and what we trust
D1. VLBI network size (F1-vlbi)
Earlier workflow: About 40 radio telescopes.
Evidence: The IVS Network Stations list has 38 entries; the ITRF2020 VLBI input covers 154 stations at 117 sites over the whole observation history.[3],[2]
We trust: The IVS list for the current network; the ITRF2020 figures for the input.
Our check of the source: Confirmed
D2. GNSS network size (F1-gnss)
Earlier workflow: 500+ continuous stations (535).
Evidence: IGSNetwork.json has 535 entries. The file does not say whether all are current. The ITRF2020 input retained 1,344 stations at 1,159 sites.[1],[2]
We trust: The file for the count; the entry count is kept, with the caveat.
Our check of the source: Confirmed
D3. GNSS route into the ITRF (F6-igs)
Earlier workflow: IGS SINEX arrives via the Analysis Centre Coordinator (Geoscience Australia and NASA GSFC).
Evidence: The ACC's duties are the operational IGS products. The ITRF-facing route is the IGS Reference Frame Coordinator, who combines the Analysis Centres' SINEX solutions; the IGS contribution to the ITRF is the reprocessed product of that working group.[13],[14],[2]
We trust: The IGS Reference Frame page and the ITRF2020 paper.
Our check of the source: Confirmed
D4. Data centres (F4-gdc)
Earlier workflow: Three global data centres for all techniques: CDDIS, IGN, SIO.
Evidence: Those are IGS data centres. IVS has three primary data centres (CDDIS, BKG, Paris Observatory), IDS two (CDDIS, IGN), ILRS two operations centres (NASA, EDC). The ITRF2020 input data are held at CDDIS.[7],[8],[9],[6],[2]
We trust: The technique services' own pages.
Our check of the source: Considered
D5. JTRF software (F8-jtrf)
Earlier workflow: JTRF uses a Kalman filter and GipsyX (corrected on 30 Sep to a square-root information filter and smoother).
Evidence: JPL's own pages: JTRF2020 was determined with SREF, a square-root information filter with a Dyer-McReynolds covariance smoother. KALREF was used for JTRF2014. The graph record jpl-jtrf-sref points at JPL's Approach page, which loads but does not name SREF; the two pages cited here do.[18],[19]
We trust: JPL's JTRF2020 and news pages. The 30 Sep correction stands.
Our check of the source: Confirmed
D6. DTRF software (F8-dtrf)
Earlier workflow: DGFI-TUM combines with DOGS-CS.
Evidence: The DTRF2020 pages describe a two-step normal-equation combination and the software APROPOS for post-seismic deformation. DOGS-CS is not named on them. The graph record dgfi-tum-dogs-cs has the URL of the combination-strategy page, which does not support its DOGS-CS claim.[17],[21]
We trust: The DGFI-TUM pages. DOGS-CS is Unverified.
Our check of the source: Considered
D7. Independent cross-validation (F8-dtrf, F8-jtrf, F8-cmp)
Earlier workflow: DTRF and JTRF are independent solutions that cross-validate the IGN candidate.
Evidence: JTRF2020 is built from the inputs submitted for ITRF2020; DTRF2020 is based on input from the four services; the ITRF2020 paper says the two other centres generate combined solutions from ITRF input data. The independence is one of method: the input data are shared. The topology has no flow from the technique analysis Steps into the DTRF and JTRF Steps.[18],[21],[2]
We trust: JPL, DGFI-TUM and the ITRF2020 paper.
Our check of the source: Considered
D8. Who designates the ITRF (F9-des)
Earlier workflow: The IERS Directing Board designates the ITRF.
Evidence: The Directing Board page says it exercises general control over the activities of the service. No page fetched shows the Board designating a realisation. The IERS states that a validation procedure precedes the choice of the official solution and does not say who performs it.[24],[22]
We trust: The IERS pages. Designation is Unverified as a step in this product path.
Our check of the source: Confirmed
D9. CATREF described as proprietary (F7-cand, F7-itrs)
Earlier workflow: The combination uses proprietary in-house software.
Evidence: The ITRF2020 paper says CATREF is available free of charge to research groups within institutions that sign an agreement with IGN for non-commercial research, which is restricted licensing.[2]
We trust: The ITRF2020 paper; the wording IGN's CATREF, licensed and restricted, matches the source.
Our check of the source: Confirmed
D10. SLR network size (F1-slrd)
Earlier workflow: ILRS network: 57 site entries, active count not stated.
Evidence: Correct as far as it goes. No ILRS page states an active count; any count of rows is ours and is not recorded here as a sourced figure.[25]
We trust: The ILRS pages; no count is stored.
Our check of the source: Considered
D11. DORIS beacons (F1-slrd)
Earlier workflow: About 60 IDS beacons.
Evidence: Not on any IDS page fetched. The ITRF2020 DORIS input is 201 stations at 87 sites.[4]
We trust: The IDS 16 page for the input; the beacon count is Unverified.
Our check of the source: Confirmed
D12. Four-technique co-location sites (F1-coloc)
Earlier workflow: The stations graph records 12 four-technique co-location sites and 182 co-location sites.
Evidence: The ITRF2020 paper names six four-technique sites and counts local ties at 101 sites. The graph's rule (same link id or core identifier) is looser than the paper's.[2]
We trust: The ITRF2020 paper.
Our check of the source: Confirmed
Evidence still needed
13 open questions across 11 Steps. A question that concerns several Steps is listed under each, so the per-Step counts add up to 20.
G1. Who performs the validation procedure that the IERS says precedes the choice of the official ITRF, and what do they compare?
Steps: F8-cmp, F9-des . Who could answer: IERS (Directing Board and ITRS Centre)
A good answer: A named body, and a document or minutes that describe the comparison and its criteria.
G2. Does the IERS Directing Board take any formal step on a new ITRF, and where is that recorded?
Steps: F9-des . Who could answer: IERS Directing Board
A good answer: A statement of the Board's role, with the minutes or terms of reference that record it.
G3. Is DOGS-CS the software DGFI-TUM used to combine DTRF2020?
Steps: F8-dtrf . Who could answer: DGFI-TUM — Deutsches Geodätisches Forschungsinstitut, Technische Universität München
A good answer: The software name as DGFI-TUM states it, on a page or in a paper that describes the DTRF2020 combination.
G4. How do observations travel from the stations to the data centres for each technique in the ITRF chain (first-mile transport)?
Steps: F3-push, F3-sched, F3-evlbi . Who could answer: IVS, ILRS, IGS and IDS
A good answer: For each technique, the transfer method and its timing, from the service's own documentation.
G5. Should DTRF and JTRF be drawn as parallel combination stages beside the IGN combination, with validation as a separate step?
Steps: F7-itrs, F8-dtrf, F8-jtrf, F8-cmp . Who could answer: UN-GGCE (workflow structure)
A good answer: A decision on the workflow structure by the people who own the workflow.
G6. Is the BKG IVS data centre operating in 2026?
Steps: F4-gdc . Who could answer: BKG
A good answer: A current statement from the IVS or BKG of the archive's public availability.
G7. Do the DTRF2020 and JTRF2020 combinations use exactly the service submissions used for ITRF2020 (same files and weights), or the same services re-processed?
Steps: F8-dtrf, F8-jtrf . Who could answer: DGFI-TUM and JPL
A good answer: A statement by DGFI-TUM and JPL of which technique solutions they combined, and whether any were re-weighted or re-processed.
G8. How many SLR stations and sites entered ITRF2020, and how many are in the southern hemisphere?
Steps: F1-slrd . Who could answer: ILRS
A good answer: The ITRF2020 SLR input station and site counts, as given for GNSS, VLBI and DORIS.
G9. What is the current number of DORIS beacons, given that '~60' appears in the earlier workflow but on no IDS page fetched?
Steps: F1-slrd . Who could answer: IDS
A good answer: A current beacon count with the IDS page that states it.
G10. What role does IPGP have in hosting the ITRS Centre, given that the ITRF2020 data-set citation names IGN and IPGP?
Steps: F7-itrs . Who could answer: IERS ITRS Centre
A good answer: A statement by the IERS or the ITRS Centre of the hosting arrangement.
G11. Which institutions are the six IGS global data centres, stated in text and not only in logo images?
Steps: F4-gdc . Who could answer: IGS
A good answer: A list in text on an IGS page, or in an IGS document.
G12. Are all 535 entries of the IGS network file current stations?
Steps: F1-gnss . Who could answer: IGS
A good answer: The file's own statement of what an entry is, or a current count from the IGS Central Bureau.
G13. What criteria does the comparison of realisations apply (origin, scale, station positions, Earth orientation parameters), and who set them?
Steps: F8-cmp . Who could answer: IERS (Directing Board and ITRS Centre)
A good answer: A document that lists the compared quantities and tolerances.
Versions
- Workflow DataBook
- data/shacl/itrf-workflow.databook.md v0.4.1 (234 triples; the frontmatter's 224 is stale)
- Topology graph
- https://w3id.org/ggsc/databooks/itrf-workflow-v0.4#workflow-topology
- Evidence graph
- https://w3id.org/ggsc/graph/itrf-evidence (loaded 12 Oct 2026)
- Dump read
- ggsc_2026-10-10_00-30-30.nq.gz (10 Oct 2026 00:30 UTC)
- Pages fetched
- 2026-10-12
- 0.1.0-draft 2026-10-12 First draft of the page and the evidence graph (Ben Wortley). Not loaded, not deployed.
Sources
33 source records back this page: 27 Confirmed, 5 Considered, 1 Unverified. 20 were already in the provenance graph (dump of 10 Oct 2026) with the status shown; 13 were fetched and read on 12 Oct 2026 and added to the provenance graph that day. Each was fetched and its passage read. Statements with no record carry no source status.
[1]IGS station file IGSNetwork.json
Our check of the source: Confirmedread 2026-10-08dataset
Passage: Per-station 'Product' entries (Final, Rapid, Ultra: analysis-centre code with last-use date)
Supports: The file lists 535 current stations; 442 have a Rapid-product use date on or after 1 Jan 2025 (78 by one centre only; 132 in the southern hemisphere); ten Rapid analysis-centre codes appear (cod, emr, gfz, grg, jgx, jpl, ngs, sio, usn, whu), and the latest jpl Rapid use date is 2025-03-09 (counted by script, 8 Oct 2026).
[2]IERS Technical Note 41, Analysis and results of ITRF2020
Our check of the source: Confirmedread 2026-10-08operational-service
Passage: Section 3.1 'Combination model'
Supports: IERS Technical Note 41 documents the CATREF combination model used for the ITRF combination.
[3]IVS Components: Network Stations
Our check of the source: Confirmedread 2026-10-12operational-serviceadded 12 Oct
Passage: Station table (one row per station; rows counted on 12 Oct 2026)
Supports: The IVS list of network stations has 38 entries on 12 Oct 2026 (the count is ours; the page states no total).
[4]IDS 16 - Contribution to ITRF2020
Our check of the source: Confirmedread 2026-10-12operational-serviceadded 12 Oct
Passage: Series description paragraph
Supports: IDS 16 is a series of 1456 weekly SINEX files with the positions of 201 DORIS stations at 87 sites from 1993.0 to 2021.0, the combination of four analysis centres' solutions (ESA, GOP, GRG, GSC).
Our check of the source: Consideredread 2026-10-08operational-service
Passage: Local ties page: header text
Supports: IGN's ITRF site has a Local ties page and refers to co-location site surveys; the page does not define a local tie.
[6]IGS data centres (CDDIS, SIO, IGN)
Our check of the source: Consideredread 2026-10-08operational-service
Passage: Data Access page: section headings 'Global Data Centers', 'Regional Data Centers', 'Operational + Project Data Centers'
Supports: The IGS Data Access page has sections for global, regional and operational data centres; the centre names are not readable in the page text.
[7]IVS Components: Data Centers
Our check of the source: Confirmedread 2026-10-08operational-service
Passage: Table with a star column; note below the table: 'In the table, * indicates a primary IVS Data Center. There are three primary IVS Data Centers'
Supports: The IVS data-centre list marks the Paris Observatory, BKG and CDDIS (NASA GSFC) as the three primary IVS Data Centers and lists INAF (Italy) and the National Institute of Information and Communications Technology (Japan) as other data centers; the list gives no service status.
Our check of the source: Confirmedread 2026-10-12operational-serviceadded 12 Oct
Passage: Introductory paragraph
Supports: DORIS data and products are available through two IERS data centres: CDDIS (NASA GSFC) and IGN.
[9]ILRS data and products: data
Our check of the source: Confirmedread 2026-10-12operational-serviceadded 12 Oct
Passage: News item 'Revised ILRS station screening process at ILRS Operations Centers (NASA and EDC)'
Supports: The ILRS operations centres are NASA and EDC.
[10]IVS Components: Correlators
Our check of the source: Confirmedread 2026-10-08operational-service
Passage: Table row 'Washington Correlator': sponsoring organisation NEOS; programmes IVS-R4, CRF, TRF, IVS-INT-1, VGOS-OPS, VGOS-INT-A
Supports: The IVS names NEOS as sponsoring organisation of the Washington Correlator and the Astro/Geo Correlator at MPIfR as run by MPIfR, BKG and Reichert GmbH; the Tsukuba VLBI Center is sponsored by the Geospatial Information Authority of Japan; UTAS, WETZ, YEBS and VLBA are not on the list.
[11]IVS Combination Centre at BKG and DGFI-TUM
Our check of the source: Confirmedread 2026-10-08operational-service
Passage: 'IVS Combination Centre' section
Supports: The IVS Combination Centre was established by the IVS Directing Board in October 2008 as a joint effort of BKG and DGFI-TUM; it quality-controls and combines session-based input from the IVS Analysis Centres into a combined EOP product that serves the IERS.
Our check of the source: Confirmedread 2026-10-12operational-serviceadded 12 Oct
Passage: Contact table
Supports: The IDS Combination Center is at CLS, under contract with CNES, with software and strategy support from LAREG/IGN.
Our check of the source: Confirmedread 2026-10-12operational-serviceadded 12 Oct
Passage: Paragraphs 1 and 3 and the membership paragraph of the working-group description
Supports: The IGS Reference Frame Coordinator combines the Analysis Centres' SINEX solutions; the reprocessed products constitute the IGS contribution to the successive ITRF releases; the working group includes members of the IGS RF team at IGN, France.
[14]IGSMAIL-8493: New IGS Analysis Center Coordinator (24 Jul 2024)
Our check of the source: Confirmedread 2026-10-08operational-service
Passage: Message body, first paragraph
Supports: The next IGS Analysis Center Coordinator will be a collaborative effort led by NASA GSFC and Geoscience Australia, with support from GFZ and MIT.
[15]IERS ITRS Centre
Our check of the source: Confirmedread 2026-10-12operational-serviceadded 12 Oct
Passage: Mission paragraph of the 'IERS ITRS Centre' box; the box lists the web site http://itrf.ign.fr/
Supports: The ITRS Centre is responsible for the maintenance of the ITRS and the ITRF, including network coordination (design of co-location, local ties and site quality). It does not name the hosting institution in words; the host is stated in the ITRF2020 paper (record iers-tn41).
[16]ITRF2020
Our check of the source: Confirmedread 2026-10-08operational-service
Passage: Time-span table (IVS, ILRS, IGS, IDS) and 'Computation strategy' paragraph
Supports: ITRF2020 uses IVS, ILRS, IGS and IDS time series, stacked together with local ties.
[17]DTRF2020 combination strategy
Our check of the source: Confirmedread 2026-10-12operational-serviceadded 12 Oct
Passage: Paragraph beginning 'The calculation of the DTRF2020 follows a 2-step approach'
Supports: DTRF2020 follows a two-step approach on normal-equation level; post-seismic deformation is approximated with the software APROPOS. The page does not name DOGS-CS.
Our check of the source: Confirmedread 2026-10-12operational-serviceadded 12 Oct
Passage: Overview paragraph; the paragraph beginning 'While KALREF was used to determine JTRF2014'; heading 'Software: SREF'
Supports: JTRF2020 combines the VLBI, SLR, GNSS and DORIS inputs submitted for the determination of ITRF2020, using a square-root information filter and a Dyer-McReynolds covariance smoother in the software SREF, which replaced KALREF.
[19]JPL JTRF news
Our check of the source: Confirmedread 2026-10-12operational-serviceadded 12 Oct
Passage: Announcement of JTRF2020
Supports: JTRF2020 is announced as the NASA JPL contribution to ITRF2020, computed with SREF, JPL's newly developed software based on a square-root information filter and smoother algorithm.
[20]IERS ITRS Combination Centres
Our check of the source: Confirmedread 2026-10-12operational-serviceadded 12 Oct
Passage: Opening paragraph; the page lists DGFI-TUM, IGN and JPL as the three centres
Supports: The ITRS Combination Centres provide ITRF products by combining inputs from the Technique Centres and other contributors; the products go to the ITRS Centre.
[21]DTRF2020
Our check of the source: Consideredread 2026-10-08operational-service
Passage: DTRF2020 page: introductory text
Supports: DTRF2020 is an ITRS realization published by the ITRS Combination Center at DGFI-TUM; the page states that GNSS provides for the first time an independent scale realization.
[22]Other realizations of the ITRS
Our check of the source: Confirmedread 2026-10-08operational-service
Passage: Page text: 'IGN released ITRF2020-u2023 and ITRF2020-u2024, DGFI-TUM released DTRF2020-u2023, and JPL released JTRF2020-u2022'
Supports: IGN, DGFI-TUM and JPL each publish an ITRS realization (ITRF2020, DTRF2020, JTRF2020).
[23]IERS ITRF
Our check of the source: Confirmedread 2026-10-12operational-serviceadded 12 Oct
Passage: Properties table, row 'Updates'
Supports: New ITRF versions are issued 'from one to several years' apart.
Our check of the source: Confirmedread 2026-10-12operational-serviceadded 12 Oct
Passage: First paragraph
Supports: The Directing Board exercises general control over the activities of the service. The page does not describe the Board designating an ITRF realisation.
Our check of the source: Consideredread 2026-10-08operational-service
Passage: Station list: 57 'Site Code' entries
Supports: The ILRS network page lists station entries with site codes (57 entries); it does not state a count of active stations or countries.
Our check of the source: Consideredread 2026-10-08operational-service
Passage: Organization menu (site navigation)
Supports: The IERS site lists the Directing Board, Analysis Coordinator, Product Centres (Earth Orientation, Rapid Service/Prediction, Conventions, ICRS, ITRS, Global Geophysical Fluids), Technique Centres, Central Bureau and ITRS Combination Centres.
[27]International DORIS Service -- network and missions
Our check of the source: Confirmedread 2026-10-08operational-service
Passage: Home page, section 'The DORIS constellation'
Supports: DORIS is onboard the Cryosat-2, SARAL, Jason-3, Sentinel-3A, Sentinel-3B, HY-2C, HY-2D, Sentinel-6A, Sentinel-6B and SWOT altimetric satellites.
[28]IVS Components: Analysis Centers
Our check of the source: Confirmedread 2026-10-08operational-service
Passage: Table of analysis centres (Type, Software columns)
Supports: The IVS analysis-centre list includes Geoscience Australia, DGFI-TUM, the BKG Analysis Center (Full) and the BKG/DGFI Combination Center (Combi); software includes CALC/SOLVE and VieVS.
Our check of the source: Confirmedread 2026-10-08operational-service
Passage: Centre list; entries 'ILRS primary combination solution' (ilrsa) and 'ILRS backup combination solution' (ilrsb); CNES entry
Supports: The page lists a primary combination solution (ilrsa) and a backup combination solution (ilrsb) among the ILRS analysis centres, and also lists CNES (page modified 15 Sep 2026).
[30]ILRS Data Center Operations
Our check of the source: Confirmedread 2026-10-08operational-service
Passage: Text on operations centres and data centres
Supports: Normal-point data flow through the operations centres at NASA and EDC to the data centres CDDIS and EDC, which exchange data so users can still get data if one is unavailable; since August 2019 the operations centres screen incoming data.
[31]DGFI-TUM -- ITRS Combination Center, VLBI combination, DOGS-CS
Our check of the source: Unverifiedread 2026-10-12operational-service
Passage: DTRF2020 'Combination Strategy' page: title and header
Supports: DGFI-TUM's ITRS Combination Center site has a DTRF2020 Combination Strategy page. The name DOGS-CS does not appear in the page text.
[32]JPL JTRF2020 solution page (software SREF)
Our check of the source: Confirmedread 2026-10-12operational-service
Passage: 'What's New?' paragraph naming SREF; 'Extensions to the JTRF2020 Solution' paragraph on the square-root information filter and smoother
Supports: JTRF2020 was determined with a new software package, SREF (Square-root Reference frame Estimation Filter), using a sequential estimation approach with a square-root information filter and a Dyer-McReynolds covariance smoother.
[33]ACC Transition
Our check of the source: Confirmedread 2026-10-08operational-service
Passage: ACC Transition page, first paragraph
Supports: The current term for the IGS Analysis Centre Coordinators concludes at the end of 2024, ending two terms (8 years) served jointly by Geoscience Australia and MIT.