Draft for review, not for publication. Author: Ben Wortley.
From workshop findings to a sequence
After the workshops there is a method for deciding what to do first. It sorts by facts, not scores, and sequences by dependency. Two examples from our own data follow.
Indicative. This page shows how the method works; it assigns no priorities, scores, costs or dates.
Step 1
Collect
Each workshop finding against a principle, tied to a capability, a Function and the products it touches.
Step 2
Sort by facts
Count what is true of it. Nothing is scored.
Step 3
Sequence by dependency
What must exist first. Shortfalls shared by every product come early: one initiative serves all five.
Step 4
Single points run in parallel
A dependence on one centre does not wait for the capability uplift.
Facts used in step 2:Products affectedLowest dimension (People, Process, Technology, Data)Single point of dependence?What it blocksPlan phase it belongs to
Example 1: shortfalls common to the products
9 capabilities are required by all five products. 7 of those average 2.5 or lower, and 4 have Technology at 1. A shortfall here is one piece of work that serves every product, so it sorts early.
| Capability | ITRF | EOP | Gravity | ICRF | Sat. Orbits | People | Process | Tech. | Data | Average |
|---|---|---|---|---|---|---|---|---|---|---|
| Knowledge Management | 1 | 2 | 1 | 1 | 1.3 | |||||
| Data Distribution | 2 | 2 | 1 | 3 | 2 | |||||
| Data Preservation | 2 | 2 | 2 | 2 | 2 | |||||
| Data Quality Management | 2 | 2 | 1 | 3 | 2 | |||||
| Geodetic Services | 2 | 2 | 2 | 2 | 2 | |||||
| Geodetic Software and Tools | 2 | 3 | 1 | 2 | 2 | |||||
| Ground-Based Asset Management | 3 | 2 | 2 | 3 | 2.5 | |||||
| Geodetic Data Products (EOP Clocks Orbits Station Positions Gravity Models)) | 2 | 3 | 3 | 3 | 2.8 | |||||
| Equipment Calibration and Maintenance | 4 | 3 | 3 | – | 3.3 | |||||
| Metadata Management | 2 | 2 | 1 | 3 | 2 | |||||
| Network Operations | 2 | 2 | 1 | 3 | 2 |
Filled dot: the product requires the capability. Boxed number: the dimension is at 1. The heavy rule separates capabilities required by all five products from those required by four. Showing the 11 capabilities required by four or more of the 33 the products use. Scores are qualitative expert judgements from the State of Geodesy 2026 assessment. They are not a diagnosis of any centre.
Example 2: a single point of dependence (CDDIS)
Our records show CDDIS in a data-centre role for three techniques and as the holder of the ITRF2020 input data. It does not wait for the capability uplift: it runs as its own track, as a failover drill.
Service
CDDIS role in our records
Other centres named in our records
Tested failover
IGS (GNSS)
CDDIS: Global Data Centre
ESA GSSCIGN (France)KASI (Korea Astronomy and Space Science Institute)SIO / SOPACWuhan University
6 Global Data Centres in the IGS membership list.
not known
IVS (VLBI)
CDDIS: primary data centre
BKGParis Observatory
Operating status in 2026 is open (gap G06); the EOP evidence work found an IVS Board statement of an outage from April 2023.
not known
IDS (DORIS)
CDDIS: data centre
IGN France
not known
ITRF2020 input data
CDDIS: holds the ITRF2020 input data
none named
not known
ILRS (SLR)
none
NASA (ILRS operations centre)EDC (ILRS operations centre)
No CDDIS role in our records for SLR.
not known
The failover drill, in five steps
- 1. Inventory what the centre holds, by technique
- 2. Name an alternate for each
- 3. Agree a sync with each alternate
- 4. Run a scheduled failover drill
- 5. Count technique archives with a tested alternate
We hold role lists, not mirroring arrangements. Whether the centres actually mirror one another is not in our records, so it is the first workshop question. A centre named here is a candidate alternate, not a confirmed one.