Draft for review, not for publication. Author: Ben Wortley. The initiatives are examples; the phases and objectives are the plan's own.

Roadmap board: example initiatives on the Joint Development Plan

Each of the 35 example initiatives sits under the plan objective where most of its activities fall, so the board shows what happens in which phase.

  • Card edge colour: the Program Work Stream most of the initiative's activities belong to
  • Stakeholder Communication and Engagement (42)
  • Critical infrastructure Development (39)
  • Technical Standards and Data Collection (28)
  • Arrow (coloured by product): points to the initiative that needs the one it leaves, same product only
Highlight a product

Pick a product to see its dependency arrows; an arrow points to the initiative that needs the one it leaves.

3 phases, 13 objectives, 109 plan activities, 35 initiatives placed. Select a card to read more. A small “starts in Phase N” tag means the initiative's earliest activity is in an earlier phase than its lane. The plan does not say which Goal each objective serves, so none is shown.

Phase 1: Avoid further degradation of the global geodesy supply chain

39 plan activities · 5 objectives · 17 example initiatives

1.1Member States are engaged in geodesy governance

6 plan activities · 4 example initiatives

EOPEI-6Close the evidence gaps in the EOP chain and keep the workflow currentselect to read

Earth Orientation Parameters · mostly Critical infrastructure Development

Also touches1.31.42.1

Capabilities: Performance Management; Risk Management; Strategic Planning; Stakeholder Communication and Engagement

Plan activities (4): #4 #18 #28 #46

Not covered by the plan:
  • resolving QA step, DORIS role, input weights, correlator hosts, BKG status
  • periodic re-check of the workflow against sources

Open the Earth Orientation Parameters page

ITRFTI-1Close the evidence gaps in the ITRF chain and keep the workflow currentselect to read

International Terrestrial Reference Frame · mostly Critical infrastructure Development

Also touches1.31.42.1

Capabilities: Performance Management; Risk Management; Strategic Planning; Stakeholder Communication and Engagement

Plan activities (4): #4 #18 #28 #46

Not covered by the plan:
  • Every open question in the reconciliation: who validates the realisations, who designates the official ITRF, first-mile transport, DGFI-TUM software, SLR counts, which correlators fed the ITRF2020 VLBI input, BKG data-centre status; the topology fixes; the stored risks marked needs-revision; periodic re-checking of the workflow against sources.

Open the International Terrestrial Reference Frame page

ICRFCI-7Close the evidence gaps in the ICRF workflow and keep it currentselect to read

International Celestial Reference Frame · mostly Critical infrastructure Development

Also touches1.31.42.1

Capabilities: Performance Management; Risk Management; Strategic Planning; Stakeholder Communication and Engagement

Plan activities (4): #4 #18 #28 #46

Not covered by the plan:
  • Resolving the Unknown and Unverified items listed in section 2 (G7)
  • Periodic re-check of the workflow against its sources

Open the International Celestial Reference Frame page

ORBITSSI-6Close the evidence gaps and keep the workflow currentselect to read

Satellite orbits · mostly Critical infrastructure Development

Also touches1.31.42.1

Capabilities: Performance Management; Risk Management; Strategic Planning; Stakeholder Communication and Engagement

Plan activities (4): #4 #18 #28 #46

Not covered by the plan:
  • Resolving: today's ACC operator, SPOCC's operational role, whether an SLR check gates routine releases, DORIS's role in the combination, the basis of "IERS validation", whether an SLA or MoU exists for the ACC role
  • Periodic re-check of the workflow against sources (a project task, not a JDP activity)

Open the Satellite orbits page

1.2Maintain current accuracy and reliability of geodetic products

7 plan activities · 8 example initiatives

EOPEI-3VLBI network resilienceneeds: EI-1select to read

Earth Orientation Parameters · mostly Critical infrastructure Development

Needs: EI-1 Formalise and open the combination relationship

Also touches2.12.32.4

Capabilities: Network Operations; Disaster Recovery and Supply Chain Continuity; Funding and Investment; Risk Management; Stakeholder Communication and Engagement

Plan activities (8): #7 #9 #11 #12 #42 #45 #61 #76

Not covered by the plan:
  • replacement of single-source station hardware
  • VGOS rollout and S/X transition plan
  • southern-hemisphere VLBI and SLR coverage

Open the Earth Orientation Parameters page

ITRFTI-5Observing network and co-location sitesselect to read

International Terrestrial Reference Frame · mostly Critical infrastructure Development

Also touches2.12.32.42.52.63.1

Capabilities: Network Operations; Disaster Recovery and Supply Chain Continuity; Regulatory Compliance; Funding and Investment; Risk Management; Stakeholder Communication and Engagement; Ground-Based Asset Management; Model of the Global Geodesy Supply Chain; Stakeholder Identification and Analysis

Plan activities (14): #7 #9 #11 #12 #40 #42 #61 #69 #72 #76 #85 #86 #88 #91

Not covered by the plan:
  • Sites that carry all four techniques (six in TN41); southern-hemisphere VLBI (14 of 117 sites in the ITRF2020 input) and SLR coverage; an SLR active-station count; the DORIS station base; all four acquisition capabilities, none of which has a JDP activity.

Open the International Terrestrial Reference Frame page

ITRFTI-6A sustained local-ties programmeneeds: TI-1, TI-5select to read

International Terrestrial Reference Frame · mostly Critical infrastructure Development

Needs: TI-1 Close the evidence gaps in the ITRF chain and keep the workflow current; TI-5 Observing network and co-location sites

Capabilities: Network Operations

Plan activities (1): #7

Not covered by the plan:
  • Almost all of it: a recurring, funded survey programme (the annex describes campaign-basis ties; the reconciliation is silent); tie standards and SINEX products; survey priority at the six four-technique sites; ties at the 101 sites where they exist.

Open the International Terrestrial Reference Frame page

ITRFTI-8First-mile transport and dissemination continuityneeds: TI-1, TI-4select to read

International Terrestrial Reference Frame · mostly Technical Standards and Data Collection

Needs: TI-1 Close the evidence gaps in the ITRF chain and keep the workflow current; TI-4 Continuity of the archive across the four techniques

Also touches2.12.42.5

Capabilities: Data Architecture Design; Disaster Recovery and Supply Chain Continuity; Standards Development and Promotion; Data Sharing; Geodetic Services

Plan activities (11): #8 #11 #13 #43 #45 #48 #66 #73 #75 #82 #83

Not covered by the plan:
  • Evidence on how data reaches the archive centres (Unknown in the reconciliation); availability commitments and tested failover for itrf.ign.fr and datacenter.iers.org; a second publication route.

Open the International Terrestrial Reference Frame page

ICRFCI-5Strengthen the observing network and the transport of its dataselect to read

International Celestial Reference Frame · mostly Critical infrastructure Development

Also touches2.12.32.42.52.6

Capabilities: Network Operations; Disaster Recovery and Supply Chain Continuity; Funding and Investment; Risk Management; Stakeholder Communication and Engagement; Ground-Based Asset Management

Plan activities (10): #7 #9 #11 #12 #42 #45 #61 #76 #85 #88

Not covered by the plan:
  • Replacement or upgrade of station equipment for geodetic VLBI
  • Station coverage in the southern hemisphere (the annex statement is Unverified)
  • An alternative to module shipping when customs or distance delay it (2018 Kokee case), and e-VLBI capacity
  • Any ICRF-specific spectrum risk: none was established in the earlier notes, so the spectrum activities #69, #72 and #76 are not counted as covering a gap

Open the International Celestial Reference Frame page

ICRFCI-6Keep dissemination of the adopted frame dependableselect to read

International Celestial Reference Frame · mostly Technical Standards and Data Collection

Also touches2.42.5

Capabilities: Data Architecture Design; Curriculum Development and Delivery; Standards Development and Promotion; Data Sharing; Geodetic Services

Plan activities (8): #8 #10 #13 #66 #73 #75 #82 #83

Not covered by the plan:
  • Availability commitments for the ICRS Centre site, the IERS annual report and CDS Strasbourg as publication routes
  • The iers.org ICRF pages (HTTP 404 on 12 Oct 2026, Unverified)
  • Adoption by any route other than a General Assembly resolution

Open the International Celestial Reference Frame page

GRAVITYGI-2Continuity agreements and second-host options for the services concentrated at GFZneeds: GI-7select to read

Gravity · mostly Critical infrastructure Development

Needs: GI-7 Close the evidence and model gaps in the Gravity chain and keep it current

Also touches1.12.12.22.3

Capabilities: Policy Formulation; Network Operations; Disaster Recovery and Supply Chain Continuity; Funding and Investment; Strategic Planning; Mandate; Risk Management

Plan activities (13): #3 #7 #9 #11 #12 #42 #45 #48 #49 #56 #57 #58 #61

Not covered by the plan:
  • a mirror or alternative host for ICGEM or the ISDC archive (existence Unknown)
  • a service-level commitment for ICGEM, which the annex says rests on GFZ's institutional budget (Unverified)
  • PO.DAAC's role as an archive (Unverified)
  • a Germany entry in the country risk projections

Open the Gravity page

ORBITSSI-5Tracking network and first-mile resilienceselect to read

Satellite orbits · mostly Critical infrastructure Development

Also touches2.42.52.6

Capabilities: Network Operations; Disaster Recovery and Supply Chain Continuity; Regulatory Compliance; Stakeholder Communication and Engagement; Ground-Based Asset Management

Plan activities (9): #7 #9 #11 #12 #69 #72 #76 #85 #88

Not covered by the plan:
  • Concentration among the 16 Operational Data Centres (no source gives each one's share)
  • SLR coverage of GPS satellites (two GPS rows among 87 GNSS rows); SLR Data Acquisition has no JDP activity
  • GNSS constellations and their operators are external inputs outside the supply chain's control

Open the Satellite orbits page

1.3Decision-makers are convinced of importance of geodesy

7 plan activities · 0 example initiatives

1.4Develop and retain a talented and diverse workforce in areas it is urgently needed

14 plan activities · 5 example initiatives

EOPEI-4Knowledge and software successionselect to read

Earth Orientation Parameters · mostly Stakeholder Communication and Engagement

Also touches2.32.4

Capabilities: Curriculum Development and Delivery; Knowledge Management

Plan activities (5): #21 #22 #29 #62 #68

Not covered by the plan:
  • documented succession for the Field System, correlator and combination software
  • open maintenance arrangements

Open the Earth Orientation Parameters page

ITRFTI-7Knowledge and software succession for the combination and technique teamsneeds: TI-1select to read

International Terrestrial Reference Frame · mostly Stakeholder Communication and Engagement

Needs: TI-1 Close the evidence gaps in the ITRF chain and keep the workflow current

Also touches2.32.42.5

Capabilities: Curriculum Development and Delivery; Outreach and Public Awareness; Knowledge Management

Plan activities (7): #21 #22 #23 #29 #62 #68 #84

Not covered by the plan:
  • Succession for named software and teams (CATREF at IGN, SREF at JPL, the DTRF software, the technique combination teams); written methods that a second institution could run; the terms on which CATREF is shared (TN41: free to research groups under agreement with IGN). Geodetic Software and Tools and the four processing capabilities have no JDP activity.

Open the International Terrestrial Reference Frame page

ICRFCI-4Sustain the capacity to construct the next realisationselect to read

International Celestial Reference Frame · mostly Stakeholder Communication and Engagement

Also touches2.32.43.2

Capabilities: Curriculum Development and Delivery; Knowledge Management; Research and Development Execution; Research and Development Planning

Plan activities (8): #21 #22 #24 #62 #68 #98 #106 #108

Not covered by the plan:
  • Maintenance of Calc/Solve and MODEST, or a second package for the final solutions (one package per frequency band produced ICRF3)
  • Continuity of a working group for a next realisation (the ICRF3 group had a 2012 to 2018 mandate)
  • Training and Education: no JDP activity is tagged to it (Curriculum Development and Delivery is a different capability)
  • VLBI Data Processing and Analysis and Geodetic Software and Tools: no JDP activity is tagged to either

Open the International Celestial Reference Frame page

GRAVITYGI-6Data quality, software and workforce capability across the satellite chainselect to read

Gravity · mostly Technical Standards and Data Collection

Also touches1.21.32.4

Capabilities: Curriculum Development and Delivery; Metadata Management; Standards Development and Promotion

Plan activities (7): #10 #20 #21 #22 #29 #67 #74

Not covered by the plan:
  • Geodetic Software and Tools, Gravity Data Processing and Analysis and Data Preservation have no JDP activity
  • succession for the processing software and staff at the GRACE-FO Science Data System centres
  • the workforce statement in the annex (not re-fetched)

Open the Gravity page

ORBITSSI-2Combination and processing software successionneeds: SI-6, SI-1select to read

Satellite orbits · mostly Technical Standards and Data Collection

Needs: SI-6 Close the evidence gaps and keep the workflow current; SI-1 Secure the combination role (operator continuity, agreements and published performance)

Also touches1.22.12.32.4

Capabilities: Curriculum Development and Delivery; Disaster Recovery and Supply Chain Continuity; Knowledge Management

Plan activities (7): #10 #21 #22 #29 #45 #62 #68

Not covered by the plan:
  • A decision among the candidate combination tools (SPOCC, ROCS, the NRCan offer) and who maintains the chosen one
  • Licence and open-source status of analysis-centre software (Unknown)
  • Documented succession for analysis-centre teams; the JDP has no activity tagged Geodetic Software and Tools

Open the Satellite orbits page

1.5The value of geodesy is understood by other science organizations, industry sectors and society

5 plan activities · 0 example initiatives

Phase 2: A robust global geodesy supply chain

49 plan activities · 6 objectives · 15 example initiatives

2.1Geodetic products meet Member State accuracy, reliability and integrity standards to deliver on operational requirements

13 plan activities · 9 example initiatives

EOPEI-2starts in Phase 1Correlation and archive continuity for VLBIneeds: EI-1, EI-6select to read

Earth Orientation Parameters · mostly Critical infrastructure Development

Needs: EI-1 Formalise and open the combination relationship; EI-6 Close the evidence gaps in the EOP chain and keep the workflow current

Also touches1.2

Capabilities: Network Operations; Funding and Investment; Disaster Recovery and Supply Chain Continuity

Plan activities (4): #7 #42 #45 #48

Not covered by the plan:
  • additional correlator capacity for R4 and Intensives
  • status of the BKG IVS data centre and verification of mirrors
  • e-transfer capacity

Open the Earth Orientation Parameters page

EOPEI-5starts in Phase 1Continuity of disseminationselect to read

Earth Orientation Parameters · mostly Critical infrastructure Development

Also touches1.21.3

Capabilities: Disaster Recovery and Supply Chain Continuity; Stakeholder Communication and Engagement; Risk Management; Strategic Planning

Plan activities (9): #9 #11 #12 #16 #18 #43 #45 #48 #49

Not covered by the plan:
  • tested failover and availability commitments for the bulletin and file endpoints

Open the Earth Orientation Parameters page

ITRFTI-3Make input checks and parallel realisations a standing controlneeds: TI-1, TI-2select to read

International Terrestrial Reference Frame · mostly Critical infrastructure Development

Needs: TI-1 Close the evidence gaps in the ITRF chain and keep the workflow current; TI-2 Agree who designates, validates and can stand in for the official ITRF

Also touches2.4

Capabilities: Disaster Recovery and Supply Chain Continuity; Strategic Planning; Standards Development and Promotion

Plan activities (4): #45 #48 #49 #74

Not covered by the plan:
  • Checks on the technique series before they reach the stacking (the 2023 sign error reached published ITRF2020 UT1 and LOD); treating DTRF and JTRF as checks that use independent data rather than the same inputs; the comparison criteria and who runs them.

Open the International Terrestrial Reference Frame page

ICRFCI-1starts in Phase 1Bring the VLBA and DSN observing lanes into the ICRF chainselect to read

International Celestial Reference Frame · mostly Critical infrastructure Development

Also touches1.2

Capabilities: Network Operations; Regulatory Compliance; Disaster Recovery and Supply Chain Continuity; Stakeholder Communication and Engagement

Plan activities (5): #7 #40 #45 #46 #48

Not covered by the plan:
  • Any activity that names the VLBA, the Deep Space Network or the astrometric programmes behind K band and X/Ka
  • Where and by whom the VLBA and DSN astrometric data are archived (Unknown)
  • Dependence of K band (99% VLBA data) and X/Ka (DSN) on single arrays that are both US-run

Open the International Celestial Reference Frame page

ICRFCI-2starts in Phase 1Keep the IVS data archive continuousselect to read

International Celestial Reference Frame · mostly Critical infrastructure Development

Also touches1.22.32.4

Capabilities: Network Operations; Funding and Investment; Disaster Recovery and Supply Chain Continuity; Risk Management; Metadata Management; Standards Development and Promotion

Plan activities (7): #7 #42 #45 #48 #61 #67 #74

Not covered by the plan:
  • Status of the BKG data centre after the start of 2025 (Unverified) and the rebuilt public archive
  • Whether CDDIS or OPAR could carry the full IVS holdings (Unknown)
  • Verification of the mirrors between the two reachable centres
  • Data Preservation: no JDP activity is tagged to it at all

Open the International Celestial Reference Frame page

GRAVITYGI-3starts in Phase 1Bring the time-variable gravity path (COST-G) into the supply-chain designneeds: GI-2, GI-7select to read

Gravity · mostly Critical infrastructure Development

Needs: GI-2 Continuity agreements and second-host options for the services concentrated at GFZ; GI-7 Close the evidence and model gaps in the Gravity chain and keep it current

Also touches1.22.2

Capabilities: Network Operations; Funding and Investment; Mandate; Disaster Recovery and Supply Chain Continuity; Policy Formulation

Plan activities (8): #7 #42 #44 #45 #48 #56 #57 #58

Not covered by the plan:
  • COST-G funding after the EU project period of 2020 to 2022 (Unknown)
  • a link from F5 to F9 in the workflow
  • any gravity-specific combination agreement; the JDP names combination centres in general only (#7, #45)

Open the Gravity page

GRAVITYGI-7starts in Phase 1Close the evidence and model gaps in the Gravity chain and keep it currentselect to read

Gravity · mostly Critical infrastructure Development

Also touches1.3

Capabilities: Risk Management; Stakeholder Communication and Engagement; Disaster Recovery and Supply Chain Continuity; Strategic Planning

Plan activities (4): #18 #46 #48 #50

Not covered by the plan:
  • the role of IGFS or IAG Commission 2 in evaluating global models (no source found)
  • the current NASA funding position for GRACE-C
  • revision of event GGM-2025-01
  • required capabilities for F5 and F8
  • PO.DAAC and the GRACE-FO Level-2 handbook (not fetched)

Open the Gravity page

ORBITSSI-1starts in Phase 1Secure the combination role (operator continuity, agreements and published performance)needs: SI-6select to read

Satellite orbits · mostly Critical infrastructure Development

Needs: SI-6 Close the evidence gaps and keep the workflow current

Also touches1.11.22.22.3

Capabilities: Policy Formulation; Network Operations; Funding and Investment; Disaster Recovery and Supply Chain Continuity; Strategic Planning; Mandate; Risk Management

Plan activities (11): #3 #7 #42 #43 #45 #48 #49 #56 #57 #58 #61

Not covered by the plan:
  • A charter or service agreement for the Analysis Centre Coordinator role (whether one exists beyond the 66-04 decision is Unknown)
  • A tested handover or backup between operators, and the status of the NASA/Geoscience Australia parallel run
  • Published performance of the Ultra-Rapid, Rapid and Final lines
  • A judgement on whether one agency holding four IGS roles is a jurisdiction risk (a working-group decision)

Open the Satellite orbits page

ORBITSSI-4starts in Phase 1Real-time service independenceneeds: SI-6, SI-1select to read

Satellite orbits · mostly Critical infrastructure Development

Needs: SI-6 Close the evidence gaps and keep the workflow current; SI-1 Secure the combination role (operator continuity, agreements and published performance)

Also touches1.22.4

Capabilities: Network Operations; Disaster Recovery and Supply Chain Continuity; Data Sharing

Plan activities (4): #7 #45 #48 #75

Not covered by the plan:
  • Almost all of it: the dependency of real-time streams on GFZ, CODE and IGU orbits, and on the two casters (Germany, USA), has no JDP activity
  • The share of users on each caster and stream (Unknown)

Open the Satellite orbits page

2.2Global geodesy supply chain governance is commensurate with risk

6 plan activities · 3 example initiatives

EOPEI-1starts in Phase 1Formalise and open the combination relationshipneeds: EI-6select to read

Earth Orientation Parameters · mostly Critical infrastructure Development

Needs: EI-6 Close the evidence gaps in the EOP chain and keep the workflow current

Also touches1.11.22.12.3

Capabilities: Policy Formulation; Network Operations; Disaster Recovery and Supply Chain Continuity; Strategic Planning; Mandate; Risk Management

Plan activities (8): #3 #7 #48 #49 #56 #57 #58 #61

Not covered by the plan:
  • EOP-specific SLA between the rapid and final centres
  • publication of combination method and input weights
  • independent performance monitoring of EOP centres

Open the Earth Orientation Parameters page

ITRFTI-2starts in Phase 1Agree who designates, validates and can stand in for the official ITRFneeds: TI-1select to read

International Terrestrial Reference Frame · mostly Critical infrastructure Development

Needs: TI-1 Close the evidence gaps in the ITRF chain and keep the workflow current

Also touches1.11.22.12.3

Capabilities: Policy Formulation; Network Operations; Regulatory Compliance; Mandate; Risk Management

Plan activities (8): #3 #7 #40 #44 #56 #57 #58 #61

Not covered by the plan:
  • An ITRF-specific statement of who designates the official realisation and on what comparison; a mandate and tested route for a second institution to produce the official solution; the funding basis for the ITRS Centre (stated in TN41 as IGN, partly CNES); publication of the combination method.

Open the International Terrestrial Reference Frame page

ICRFCI-3starts in Phase 1Make maintenance between ICRF realisations accountableselect to read

International Celestial Reference Frame · mostly Stakeholder Communication and Engagement

Also touches1.11.22.12.3

Capabilities: Policy Formulation; Network Operations; Mandate; Standards Development and Promotion

Plan activities (9): #3 #7 #44 #54 #55 #56 #57 #58 #64

Not covered by the plan:
  • An ICRF-specific charge: which body maintains the frame between General Assemblies in practice (the Resolution names the IVS and the IERS; no service level was found)
  • Which body, if any, is charged with a fourth realisation, and when (Unknown)
  • Publication of the defining-source selection method (Unknown)
  • A standing owner for optical-radio comparison and for imaging the defining sources that have no VLBI image
  • Reference Frames, Geodetic Data Products and Research and Development Prototyping: no JDP activity is tagged to any of them

Open the International Celestial Reference Frame page

2.3Decision-makers are convinced of the importance of a robust supply chain

7 plan activities · 0 example initiatives

2.4Implement open data sharing and protect radio frequency spectrum

11 plan activities · 3 example initiatives

ITRFTI-4starts in Phase 1Continuity of the archive across the four techniquesneeds: TI-1select to read

International Terrestrial Reference Frame · mostly Technical Standards and Data Collection

Needs: TI-1 Close the evidence gaps in the ITRF chain and keep the workflow current

Also touches1.21.32.1

Capabilities: Network Operations; Curriculum Development and Delivery; Metadata Management; Disaster Recovery and Supply Chain Continuity; Data Sharing; Standards Development and Promotion

Plan activities (9): #7 #10 #20 #45 #48 #66 #67 #73 #74

Not covered by the plan:
  • A tested failover between archive centres; the dependence on CDDIS, which serves all four techniques and holds the ITRF2020 inputs; the per-technique centre lists (IVS, ILRS, IDS, IGS differ); Data Preservation, which has no JDP activity; the status of BKG as an IVS primary data centre.

Open the International Terrestrial Reference Frame page

GRAVITYGI-5starts in Phase 1Open, FAIR and standards-based surface gravity dataneeds: GI-7select to read

Gravity · mostly Technical Standards and Data Collection

Needs: GI-7 Close the evidence and model gaps in the Gravity chain and keep it current

Also touches1.21.31.5

Capabilities: Data Architecture Design; Curriculum Development and Delivery; Standards Development and Promotion; Metadata Management; Data Sharing; Knowledge Management; Policy Formulation; Outreach and Public Awareness

Plan activities (12): #8 #10 #13 #20 #38 #66 #67 #68 #70 #71 #73 #75

Not covered by the plan:
  • which institutions observe and submit surface gravity, and where coverage is thin (Unknown)
  • restrictions on historical surface data (Unverified)
  • resourcing of BGI, the surface archive named by the IAG
  • adoption of the new terrestrial gravity reference frame effort (JWG 2.1.1) as a JDP activity

Open the Gravity page

ORBITSSI-3starts in Phase 1Archive and distribution continuity across the Global Data Centresneeds: SI-6, SI-1select to read

Satellite orbits · mostly Technical Standards and Data Collection

Needs: SI-6 Close the evidence gaps and keep the workflow current; SI-1 Secure the combination role (operator continuity, agreements and published performance)

Also touches1.21.32.12.5

Capabilities: Data Architecture Design; Curriculum Development and Delivery; Disaster Recovery and Supply Chain Continuity; Standards Development and Promotion; Metadata Management; Strategic Planning; Data Sharing; Geodetic Services

Plan activities (15): #8 #10 #11 #13 #20 #45 #48 #49 #66 #67 #73 #74 #75 #82 #83

Not covered by the plan:
  • A rehearsed equalisation or failover among the six Global Data Centres (invocation and rehearsal are not shown)
  • Availability commitments for products and archive endpoints
  • Disaster recovery for the Regional Data Centres (BKG statement Unknown)
  • Data Preservation: no JDP activity is tagged to it

Open the Satellite orbits page

2.5Member States have a modern Geospatial Reference System

9 plan activities · 0 example initiatives

2.6Member States are developing and maintaining regional reference frames

3 plan activities · 0 example initiatives

Phase 3: A next-generation global geodesy supply chain

21 plan activities · 2 objectives · 3 example initiatives

3.1Decision-makers are convinced of the importance of a next-generation supply chain

8 plan activities · 1 example initiative

GRAVITYGI-4starts in Phase 1Widen and document the static-model path (anomaly grids and ultra-high-degree models)needs: GI-7select to read

Gravity · mostly Stakeholder Communication and Engagement

Needs: GI-7 Close the evidence and model gaps in the Gravity chain and keep it current

Also touches1.42.12.43.2

Capabilities: Research and Development Planning; Funding and Investment; Knowledge Management; Innovation Strategy Development; Technology Scouting

Plan activities (8): #25 #34 #52 #68 #89 #92 #94 #106

Not covered by the plan:
  • independent production capability or grid supply beyond the United States, Germany and TU Munich (the annex's closed set is not borne out; independence of other degree/order 2190 models is Unknown)
  • the producer and harmonisation institution for national anomaly grids (Unknown)
  • the status of EGM2020 (Unverified)
  • Geodetic Data Products and R&D Prototyping have no JDP activity

Open the Gravity page

3.2Availability of higher accuracy and stability geodetic products

13 plan activities · 2 example initiatives

GRAVITYGI-1starts in Phase 2Plan for continuity of satellite gravity observationneeds: GI-7, GI-2select to read

Gravity · mostly Critical infrastructure Development

Needs: GI-7 Close the evidence and model gaps in the Gravity chain and keep it current; GI-2 Continuity agreements and second-host options for the services concentrated at GFZ

Also touches2.12.3

Capabilities: Funding and Investment; Cost Management; Innovation Project Management; Vision and Strategy; Partnership and Collaboration

Plan activities (5): #42 #63 #100 #103 #109

Not covered by the plan:
  • any JDP activity before Phase 3 on this topic
  • naming of GRACE-FO continuation, GRACE-C or Swarm (the JDP text says 'NASA/ESA joint missions on satellite gravimetry' in general terms)
  • a funding decision for GRACE-C through launch (Unknown in the reconciliation)
  • any activity tagged with Gravity Data Acquisition and Storage (none exists)

Open the Gravity page

ORBITSSI-7candidateCandidate: bring multi-GNSS into the official combined productsneeds: SI-1, SI-2select to read

Satellite orbits · mostly Critical infrastructure Development

Needs: SI-1 Secure the combination role (operator continuity, agreements and published performance); SI-2 Combination and processing software succession

Also touches3.1

Capabilities: Technology Scouting; Research and Development Execution; Innovation Strategy Development

Plan activities (3): #94 #101 #102

Not covered by the plan:
  • Whether the multi-GNSS coverage limit is a robustness gap at all is a decision for Nick and the working group; the data shows a coverage limit, not a maturity shortfall
  • Neither capability has a JDP activity tagged to it

Open the Satellite orbits page